Top of a stainless steel tank built on the welding rig on site
Tanks / Built on site

The factory
comes to you.

When a tank is too big to travel by road, we build it where it will stand, with our own teams. On site we use the same welding rig and automatic welding as in our workshop: the finish is the same.

Ø 15,000 H 20,000 STAINLESS STEEL · BUILT ON SITE
Diameter15,000 mm
Height20,000 mm
Geom. volume≈ 35,000 hL
15m
largest diameter built
20m
greatest height built
EN 1090
executed as steel structures to EN 1090
0subcontractors
installed by our in-house teams

Our own equipment, set up on site

Three machines we bring from our workshop to your site, so that a tank assembled in place is built exactly as it would be in the workshop.

Automatic welding rig with stainless steel sheet feeding in Stainless steel tank under construction on site, with the top already fitted Stainless steel coils on site, ready for the decoiler Welding rig · on site

The finish

Spot the difference

You can usually tell a site-built tank by its welds. Not ours: same welding rig, same welding and same finish as our shop-built tanks.

  • BrushedA Scotch-Brite band blends the weld into the finish of the tank.
  • PickledRestores the protective layer of the stainless steel: it is there for corrosion resistance and hygiene first, appearance second.
  • Thin weld beadOn the outside, only a regular line remains.
  • Welded to ISO 3834Our welding quality system is certified by Bureau Veritas, in the workshop and on site.
Certified

By Bureau Veritas. Details

ISO 9001Quality management systemBureau Veritas
ISO 3834Welding qualityBureau Veritas
EN 1090Steel structures: stairs, walkways and site-built tanksBureau Veritas

Our own teams, no subcontracting

We design, build and install with our own teams. Where the plant calls for it, we also supply the piping, stairs and walkways.

  1. 01

    Design and calculation

    Tank and plant modelled in 3D and verified with FEM studies and simulations before construction.

  2. 02

    Site set-up

    The welding rig, decoiler and coils arrive on site.

  3. 03

    Construction

    Automatic welding inside and outside, one shell ring after another.

  4. 04

    Finishing

    Every weld is brushed and pickled.

  5. 05

    Testing and handover

    With piping, stairs and walkways where included.

Frequently asked questions

Tanks built on site

What is the largest tank you have built on site?

15 m in diameter and 20 m high, equal to about 35,000 hL of geometric volume.

Is the finish on site the same as in the workshop?

Yes. We use the same technology: automatic welding inside and outside at the same time, then brushing with a Scotch-Brite band and pickling. On the outside, a thin, regular weld bead remains.

How do you calculate a tank this large?

With FEM studies and simulations at the design stage. On site the tank becomes a steel structure, and we build it to EN 1090, certified by Bureau Veritas.

Who installs the tank?

Our in-house teams, with our own equipment and no subcontractors, supervised by the technician who designed it.

A tank too big for the motorway?

Send us the site plan and the capacities you need.